Posted on November 16, 2026
The Ministry of Agriculture has commissioned a new Model 1270 Cutter Suction Dredge (CSD) from Ellicott Dredges and an accompanying workboat valued at approximately Guyana $US4 million, significantly expanding the National Drainage and Irrigation Authority’s (NDIA) capacity to maintain critical waterways, improve drainage and reduce flooding in agricultural and residential communities across Guyana.
The equipment was supplied via GAICO Construction and General Services Inc., at a ceremony at GAICO’s wharf facility at Nismes on the West Bank of Demerara (WBD).
Equipped with an 800-horsepower engine and 18-inch discharge pipe, the Ellicott dredge is capable of operating at depths of up to 15 metres and removing between 285 and 430 cubic metres of sediment per hour. Its addition to the NDIA’s fleet will allow the Authority to undertake extensive dredging and desilting works, particularly in rivers and outfall channels.
Agriculture Minister Zulfikar Mustapha said the acquisition represents another major investment in the country’s drainage and irrigation infrastructure.
The Minister noted that inadequate drainage infrastructure, poorly maintained canals and limited access to specialised equipment had contributed to recurring flooding, agricultural losses and the underutilisation of productive lands.
Ellicott Sales VP Paul Quinn commented:
“We are very gratified by the Government of Guyana and their contractor Gaico Construction once again recognizing the versatility of the Ellicott 1270 “Dragon” Series dredge. As they found out with their first 1270, this 18” CSD is well suited for handling a wide variety of tasks, from dredging ship channels to canals to flood prevention projects. And of course the 1270 very well known for its ruggedness and reliability, whether in US east coast ports or remote areas of Guyana. It’s also helpful for contractors like Gaico to know that the 1270 is normally available in a very short time or even from stock.”
Meanwhile, Chairman of the NDIA, Lionel Wordsworth, explained that the new dredge will play an important role in maintaining the country’s approximately 300 sluices and associated outfall channels, many of which require regular desilting to function
Mr. Wordsworth also added that the contractor will provide three months of on-the-job training for NDIA personnel, including the captain, operators and other technical staff responsible for operating and maintaining the equipment.
“The next important part is the operational training of staff. The contractor will provide that training, which will be undertaken over a period of three months. All the personnel will be trained locally and will have the requisite experience so that we can deliver effective clearing of our channels,” he explained.
Based in part on reporting by News Room