It's on us. Share your news here.

New Victoria Dock Pumps to Protect Hull Homes from Flood Risk

Posted on February 2, 2016

By Hull Daily Mail

PUMPS are to be installed at Victoria Dock‘s half-tide basin in Hull to combat rising silt levels in the Humber and protect hundreds of homes from flooding.

The move comes after it was revealed siltation levels in the estuary are the highest for 50 years.

The half-tide basin is used to store highways and groundwater drainage from the surrounding housing estate on the dock.

READ FULL ARTICLE HERE

It's on us. Share your news here.
Submit Your News Today

Join Our
Newsletter
Click to Subscribe