It's on us. Share your news here.

Van Oord and Sumitomo consortium sign long-term HVDC framework agreement with SSEN Transmission

Posted on July 13, 2026

Rotterdam, the Netherlands, 9 July 2026 – SSEN Transmission and the Sumitomo Electric and Van Oord consortium have signed a long-term framework agreement to support the delivery of future High Voltage Direct Current (HVDC) subsea transmission infrastructure across the north of Scotland. The agreement establishes a strategic partnership for the engineering, supply, transport and installation of HVDC subsea cable systems and includes initial design and engineering works for the proposed 525 kV Shetland 2 HVDC link.

The framework combines SSEN Transmission’s long-term investment programme, Sumitomo Electric’s expertise in HVDC cable manufacturing and system design, and Van Oord’s offshore transport and installation knowledge. Together, the businesses aim to support the delivery of future subsea transmission infrastructure required for the modernisation and expansion of Scotland’s electricity network.

The proposed Shetland 2 HVDC link between Shetland and mainland Scotland is expected to be one of the first projects progressed under the framework. The link will help increase network capacity, strengthen system resilience and support the integration of renewable electricity into the wider UK energy system.

‘As the energy transition accelerates, investment in offshore transmission infrastructure is becoming increasingly important to connect renewable energy to the electricity grid. This framework agreement brings together leading expertise across the HVDC value chain and establishes a strong foundation for long-term collaboration. It also reflects Van Oord’s long-standing commitment to the UK, where we have been active for more than a century and continue to work closely with local partners and supply chains to create lasting value. Together with SSEN Transmission and Sumitomo Electric, we are well positioned to deliver the critical infrastructure needed to support the UK’s energy transition.’

Maurits den Broeder, Managing Director Offshore Energy at Van Oord

As renewable energy capacity continues to expand, offshore transmission infrastructure is essential. Through this collaboration, Van Oord will help deliver offshore energy and subsea power cable projects, supporting the resilient electricity networks needed for the energy transition.

Source

It's on us. Share your news here.
Submit Your News Today

Join Our
Newsletter
Click to Subscribe