Posted on June 1, 2022
Seabed dredging has been completed at the end of the Pakri Peninsula in Lahepere Bay, where a liquefied natural gas (LNG) terminal is planned.
Posted on June 1, 2022
Seabed dredging has been completed at the end of the Pakri Peninsula in Lahepere Bay, where a liquefied natural gas (LNG) terminal is planned.