Posted on October 3, 2025
New Hopper For Boskalis
“Today marked a truly special occasion as we gathered in Krimpen aan den IJssel to celebrate the launch of the SEAWAY…Now, a new chapter begins for this remarkable state-of-the-art dredging vessel, the result of dedication, ingenuity, and above all, collaboration” said CEO Derk te Bokkel.
This cutting-edge trailing hopper suction dredger is engineered for the future and boasts a hopper capacity of 31,000 cubic meters. It is prepared to operate on alternative fuel (green) methanol as a sustainable fuel alternative. Setting new standards for efficiency and sustainability thanks to a full diesel-electric system, Azipods™ propulsion, an optimised hull design, and advanced automation. The SEAWAY is set to enter service in mid-2026.
Key Details of the IHC Hopper Launch
- Vessel Type: Trailing Suction Hopper Dredger (TSHD).
- Client: Boskalis.
- Shipyard: Royal IHC’s yard in Krimpen aan den IJssel, Netherlands.
- Launch Date: October 3, 2025.
- Key Features:
- ABB Azipod propulsion.
- Optimized underwater hull design.
- Advanced automation system.
- Full diesel-electric installation.
- Methanol plant and storage tanks.
- Dual fuel main engines.
- Delivery: Scheduled for mid-2026.
