Posted on September 7, 2015
By Linda Provost, The Duncan Banner
A project which took loans from three cities โ Duncan, Lawton and
The dredging project, under the direction of Wynn Construction, has started the first stage of the projects, Waurika Lake Master Conservancy District Manager Dave Taylor said.
โAt the end of the (project) we will have removed all the silt from the intake channel,โ he said, โreplaced the six intake gates โ which are basically valves โ and from the bottom gate we are going to run a pipeline to the middle of the lake where itโs deepest. There, we will build a floating structure on that.โ
READ FULL ARTICLE HERE