It's on us. Share your news here.

Orion Advances I-10 Calcasieu River Bridge Project With Pile Installation in Louisiana

Posted on October 11, 2026

Our crews are hard at work along the north side of the existing bridge, preparing for construction of the new eastern approach.

Two crews, two important tasks:
🔷 Installing pipe piles for the main construction trestle.
🔷 Conducting Pile Driving Analysis on a 30-inch square concrete pile ahead of permanent pile installation.

A lot of work goes into building a bridge before the bridge itself starts taking shape. Great work by our Louisiana team!

Source

It's on us. Share your news here.
Submit Your News Today

Join Our
Newsletter
Click to Subscribe