Posted on July 13, 2026
A double feature photo of Dutra’s tug the Becky T and the Derrick Barge Morty working at The Port of Long Beach on ITS’s Pier G wharf expansion project. The dredged material, which is collected using a fully electrified 8300 Liebherr crane, is used to create a huge stretch of new land to be used for container storage.