It's on us. Share your news here.

Boskalis’ BOKA Sub C Completes FPSO Errea Wittu Hook-Up Installation at 1,700-Meter Depth Offshore Guyana

Posted on November 23, 2026

Boskalis’ construction support vessel BOKA Sub C has achieved a remarkable feat in the Stabroek Block offshore Guyana. There, the vessel carried out the hook-up installation for MODEC’s brand-new FPSO Errea Wittu. Shortly before the installation project, the BOKA Sub C received its Boskalis livery, after which it was tasked with a special assignment: working at a depth of approximately 1,700 meters.

The hook-up of the FPSO Errea Wittu to the pre-installed deep-sea infrastructure proceeded safely and without delay. During the BOKA Sub C’s operations, the FPSO was kept in position by Boskalis’ powerful oceangoing tugs BOKA Defender, BOKA Keeper, BOKA Sweeper and BOKA Forward. The first three vessels had previously towed the FPSO Errea Wittu from Singapore to Guyana. Last year, Boskalis also successfully delivered the FPSO One Guyana to the Stabroek Block oil field.

Source

It's on us. Share your news here.
Submit Your News Today

Join Our
Newsletter
Click to Subscribe