Posted on November 16, 2026
The U.S. Army Corps of Engineers has been collecting data on the effects of an artificial peninsula it built out of dredged sand at Silver Beach County Park in St. Joseph this summer, and it expects to have an idea of whether the experiment worked sometime next year.
We reported back in July that the Army Corps was trying the new approach to beach nourishment to learn if it would efficiently replenish the beach. Army Corps coastal research engineer Doug Krafft tells us this could be a novel way to save on dredging.
“You’re kind of threading the needle with this approach,” Krafft said. “It may have lower construction costs and operational constraints, and having a pipe that goes up to the beach and puts it out on the beach directly, and then bulldozers come and spread it mechanically over the area that you’re trying to nourish.”
Krafft says there aren’t many examples of this being done before, so the Army Corps is interested in seeing the results.
The idea is to let Lake Michigan dissipate the deposited sand and carry it via currents to the beach, rather than using machines to do it. Already, there’s been some data.
“Waves on the Great Lakes move a lot of sand, and this is around the time that past projects of a similar size would start to really spread out into the larger-scale sediment system. So we are seeing some fairly large distribution of sediment in the current project.”
Krafft says teams have been collecting data, and he’s really interested to learn what the peninsula does throughout the winter.
So far, the peninsula has been getting smaller. The Army Corps is watching its progress via in-person visits and by satellite.