Posted on February 21, 2024
Weeks Marine has been awarded the Hudson River Ground Stabilization Project by the Gateway Development Commission.
Our scope of work, which is the first heavy construction component of the Hudson Tunnel Project, includes design-build services for modifying and stabilizing the soil in the shallow area of the river near the Manhattan shoreline. This will prepare the ground for the tunnel boring machine that will excavate the new tunnel and ensure the riverbed is protected from disruption.
Construction is expected to begin this summer.
Read more about the project: https://bit.ly/3OmXPp4