It's on us. Share your news here.

Very Busy First Half 2021 for Ellicott

Series 2070 Dredge Departing for the Port of Baltimore

Posted on June 16, 2021

The first half of 2021 has been very active for Ellicott Dredges, LLC and both the Baltimore and New Richmond manufacturing facilities have been busy building and shipping dredges all over the world. As of June 10, Ellicott has so far:

  • Shipped a total of 14 dredges and boosters, to 11 different customers in 5different countries.
  • 9 of these shipments were Dragon® Cutter Suction dredges, ranging in size and models from 370HPs (10″) to 2070s (20″)
  • 5 Booster Pump assemblies were shipped to customers, including Ellicott’s new 20″ Tier 4 Booster (more about this new product below)
  • All these shipments combined required over 50 truckloads to ship!
Series 670 Dredge Shipping from Baltimore Factory
Ellicott Field Tech Josh Moscati on Site with 20″ Booster Pump in Operation

EPA Tier 4 20″ Booster Pump Operation

Ellicott’s newly released 20″ booster pump is equipped with EPA Tier 4 engine rated at 1125 HP (838 kW). The booster is currently at work supporting the U.S. Corps of Engineers’ DMP project at Poplar Island, Maryland. This project involves offloading a volume of approximately 1.9 million yd3 of dredged material to the placement site.

Product Line

Ellicott offers a complete line of portable cutter suction dredges and booster pumps from our two locations: Main plant and executive offices in Baltimore, Maryland, and second factory in New Richmond, Wisconsin, USA.

It's on us. Share your news here.
Submit Your News Today

Join Our
Newsletter
Click to Subscribe