Posted on January 6, 2023
Construction services will consist of maintenance dredging of the federal navigation channels at Santa Barbara Harbor. Dredge material will be placed on down coast beaches. Dredging at Santa Barbara Harbor occurs biannually, generally in the late fall(November/December) and early spring (March/April) and will consist of a total of six dredge cycles. A typical dredge cycle volume is approximately 120,000 cubic yards. Dredging will occur in depths up to -35ft MLLW in an exposed, open ocean environment.Offer is due January 23, 2023. Contact information: KO CONTRACTING DIVISION 915 WILSHIRE BLVD SUITE 1109 LOS ANGELES , CA 90017-3409 Raj Cooper raj.cooper@usace.army.mil