Posted on August 13, 2025
As part of upcoming maintenance dredging at Geraldton’s Fishing Boat Harbour, the reclaim exterior road (highlighted below) will be closed from 18–24 August to allow safe installation of dredging pipes.
This closure is essential to support a routine dredging project starting later this month, which will remove naturally accumulated sediment and maintain safe vessel access for commercial, recreational, and tourism operations.
During the project:
• Dredged sand will be temporarily stored on Pages Beach.
• It will then be transported in stages to nourish local beaches and support coastal protection.
• Public access to part of Pages Beach will be limited for safety.
We’ll be working to keep disruptions to a minimum and thank you for your patience and understanding.