Posted on September 4, 2015
By Rory Jackson, SuperyachtNews.com
“We have always had berths big enough for very large vessels,” begins Foot. “We have huge floating pontoons on the outer wall of the harbour, but until now we haven’t had the water depth.” Foot goes on to explain that over the last six months, rather than buying or renting a dredger as per the norm, Solent Refit built its own from a salvaged barge. “Now we will be dredging the whole site at will and our licenses allow us to go down to five metres.
READ FULL ARTICLE HERE