It's on us. Share your news here.

Royal IHC to deliver advanced offshore wind cable lay spread

Posted on August 31, 2022

State-of-the-art cable lay system will be used for installation of inter-array power cables and its cable protection system (CPS) in offshore wind farms.

Royal IHC has won a significant contract from another major Netherlands headquartered company, Boskalis, covering the delivery of an advanced modular cable lay spread (MCLS).

The state-of-the-art cable lay system will be used for installation of inter-array power cables and their cable protection systems (CPS) in offshore wind farms.

The system has advanced features designed to deliver a marked advantage during normal lay operations.

Royal IHC will deliver the entire spread including; elevated cable highway, chutes, working habitats, quadrant handling system, active heave compensated winch, A&R winches and deck winches. The delivery will include an integrated control system linking between new and client owner-furnished equipment.

Equipment safety is at the core of all Royal IHC designed equipment and the MCLS will be delivered with a new generation centralized control suit. Careful consideration has also been given to the mobilization of the vessel, adopting a sophisticated modular system which will minimize the effort, timescale and risk traditionally associated with this stage of a campaign.

Source

It's on us. Share your news here.
Submit Your News Today

Join Our
Newsletter
Click to Subscribe