Posted on December 9, 2024
Mariners are advised of maintenance dredging works at the entrance of Patterson River at approximate location 38˚04.421’S, 145˚07.172’E (WGS84).
Dredging works will be carried out by a cutter suction dredge along the navigation channel between the Nepean Hwy bridge and the outer navigation marks. Dredged material will be deposited on the adjacent beach, south of the river entrance.
On-water plant, equipment and potential hazards to navigation arising from the works will be marked as per IALA standards.
Parks Vic Patterson River Maintenance Dredging