Posted on August 10, 2015
By Gordon Kent, Edmonton Journal
Crews will start dredging the
The river needs to be 2.1 metres deep for the two barges to operate properly, project manager Allan Bartman said Thursday.
That will require removing an average of 60 to 80 centimetres of material, less in the middle of the river and more along the edges.
READ FULL ARTICLE HERE