Twin Brothers Marine (TBM), a leader in heavy steel fabrication for the oil and gas, infrastructure, and renewables industries, has been awarded three contracts, with a combined value of over $12 million, to provide pressure vessels and infrastructure components for a major marine transportation provider and major infrastructure contractor. TBM will fabricate ASME-coded pressure vessels… Read More
The Dutra Group is proud to announce the issuance of a Notice to Proceed for the new-build construction of a 10,464 cubic yard Trailing Suction Hopper Dredge, the “Adele” at Eastern Shipbuilding Group, Inc. The “Adele” will be constructed at Eastern Shipbuilding Group’s Allanton and Port St. Joe Florida facilities. Delivery is scheduled for late 2028…. Read More
Plans to revitalize Barto Landing are moving ahead in Spring Valley. The Spring Valley City Council Monday night approved a proposal for about $150,000 to dredge Barto Landing. River Docks Inc. of Peru was awarded the job and is expected to begin dredging the river attraction as soon as possible. Last year, a message from… Read More
Conrad Shipyard, LLC,* Morgan City, Louisiana, was awarded a $28,285,715 firm fixed-price modification to previously awarded contract (N00024-22-C-2253) for detail design and construction of one additional Yard Repair, Berthing, and Messing (YRBM) craft. This contract action includes options which, if exercised, would bring the cumulative value of this contract to $59,856,020. Work will be performed… Read More
LAHORE: Karachi Gateway Terminal Ltd (KGTL) is driving a dredging initiative at Karachi Port’s East Wharf to deepen the channel and berths to a depth of 15.5 metres for handling larger vessels of up to 350 metres in length and cargo carrying capacity of over 13,000 TEUs (Twenty-Foot Equivalent Units). According to a KGTL spokesman,… Read More