It's on us. Share your news here.

Jan De Nul Group: Structural work on the entrance of the Scheldt tunnel at Linkeroever is complete

Posted on March 31, 2025

In Antwerp, Belgium, the structural work on the entrance of the Scheldt tunnel at Linkeroever is complete. That means we are one step closer to piecing together the massive concrete sections that will together form the Scheldt tunnel.

Right now, those eight massive concrete giants are still in Zeebrugge, getting ready for an incredible journey – they will float more than 100 kilometres across the North Sea and the Scheldt to Antwerp. And the wait will not be long as the first one already sets off in May.

From transport to the complex underwater installation, together with TM COTU we are preparing every step down to the finest details.

Together with Lantis and TM COTU: BESIX , DEME Group , and STADSBADER CONTRACTORS NV

No alternative text description for this image

Source

It's on us. Share your news here.
Submit Your News Today

Join Our
Newsletter
Click to Subscribe