Posted on September 10, 2025
Ellicott Dredge Enterprises (EDE), LLC assigns an exclusive representation agreement for Geopool to Bluff City Construction (BCC), LLC for the Great Lakes and part of the Midwestern United States. EDE with BCC have successfully deployed GeoPool® dewatering technology in both full scale and pilot demonstration projects within the continental United States.
BCC recently took delivery of a brand-new reusable and scalable GeoPool V6 dewatering system with 6,000 yds3 (4,642m3) capacity. BCC will utilize the pilot pool to demonstrate the efficiency of GeoPool on various wastewater, environmental, and industrial sites after successful bench tests are concluded in BCC’s accredited analytical and geotechnical laboratory. This will allow clients to go full scale with multiple reusable GeoPools to reduce dewatering costs over using traditional mechanical dewatering systems and single use geotextile tubes.
BCC offers their customers different levels of service and support for GeoPool installations on their job site from simple sales and installation to turn-key project management. Service offerings include:
Left: BCC lab testing materials for an upcoming project. Right: BCC GeoPool bench test rig dewatering biosolids
In addition to sales and the above services, BCC offers rental and long-term lease-purchase options to give its clients more flexibility and fast track their dewatering projects.
“True success is measured by performance — and GeoPool Technology continues to deliver. Over the past few years, we’ve successfully deployed GeoPool systems across both pilot and full-scale dewatering projects, consistently achieving higher solids content and accelerating production schedules. The results speak for themselves: lower costs, faster timelines, and smarter solutions for even the most complex challenges. GeoPool’s scalability, mobility, and reusability empower us to be more innovative and competitive in the market. That’s why BCC made a strategic investment in a GeoPool pilot unit and expanded our services and financing options — to help our clients move faster, think bigger, and achieve more,” said John Kupar, Director – Project Development, BCC.
(from left to right) John Kupar, Director – Project Development, BCC, Ryan Horton, Vice President Auger Dredge