Posted on February 9, 2026
Our jack-up Innovation has returned to France for the second jacket foundation installation campaign at the Dieppe – Le Tréport offshore wind farm. Following the successful installation of 11 jackets in autumn 2025, Innovation will install 51 jackets at the 496 MW wind farm, with the first two jackets of the new campaign completed in the past days.
Between the Dieppe – Le Tréport installation campaigns, Innovation was deployed in the North Sea, where it decommissioned three gas platform jackets.