Demolition work on the remaining pieces of the Francis Scott Key Bridge is expected to start this week and continue over the next several months. The effort begins with work mainly focused on “mobilizing assets and equipment,” said Maryland Transportation Authority Press Secretary Briana McEachern. Crews will then start dismantling the remaining roadway over the Patapsco… Read More
The much-anticipated Liquefied Natural Gas plant at Crabbs Peninsula remains ready for operation, but dredging complications continue to prevent ships from accessing the facility, Director General of Communications Maurice Merchant revealed during Thursday’s post-Cabinet press briefing. Speaking after a recent tour of the LNG facility, Merchant outlined ongoing equipment challenges that have plagued the dredging… Read More
Rising seas could swallow Doran Beach, Sonoma County’s iconic camping and recreation spot. Can local action save this treasured coastline? Doran Beach, Sonoma County’s go-to spot for camping, walks along the sand and memorable sunsets, faces a future increasingly threatened by rising seas. The narrow, two-mile barrier spit that locals rely on to shelter Bodega… Read More
With the continued growth in global energy transportation demand, port dredging has become a key component in ensuring the smooth flow of resources. Recently, a cutter suction dredger and multifunctional tugboat, both built by HID Shipyard, were successfully deployed at the crude oil terminal of Alaja Port in Turkmenistan. Their mission: to improve the port’s… Read More